M / S Amrapali Group — Non adherence of commitment

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

Madam / Dear Sir

I had booked a 1575 Sq. Ft. residential unit no. 304, Tower L, Phase II, under cash down payment scheme, in one of the ongoing project of M/s Amrapali Group i.e. “Amrapali – Heartbeat City 2, Sector 107, Noida through Investor Clinic on 7th October 2011. At the time of booking, the company had promised me for a complimentary 2N + 3D trip to Singapore for a couple. The scheme was also advertised in various newspapers.

As far as my payment schedule is concerned I had kept my promise and paid all my commitments much before the scheduled dates as mentioned in the Agreement.

Repeated requests were made to the concerned officers at Amrapali Group & Investor Clinic through mail, telecom and personal visits, for providing me the singapore trip, the company offered and promised to me but all in vain.

Through this mail, I request you to kindly sort out my issue.

Hoping for your immediate intervention please.

with kind regards

Prashant Bakshi

B – 223, Pocket 2, Kendriya Vihar – 2

Sector 82, Noida

Mobile : [protected], [protected]

Landline :[protected]

Amrapali Group — Big Fraud Builder

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

I know, we have mentality to trust on own experience and that is the reason behind these fraud builder are able to sell their flats even though their track record was stamp as a cheater from the start. Never buy Amrapali Flat at all in any circumstances. This is my own assessment for this builder and it is not that I am saying this because I have any personal interest in it. In-fact, I am saying this because, I don't want innocent and common people like us trapped in these builders.
See the Facts
Service Front
– You don't expect any promise whatsoever small or big done by this builder could be completed at all
Behaviour Front
– No Manner, professionalism or any kind of interaction who comes under behaviour of an Employee taught to anybody in this company. Whoever and whatever is the position, doesn't matter. You discuss with Director, GM, DGM, Mgr who ever you will get feeling like, it is the company runs by few goons with white collar dress
Quality Front
– Go and visit any site, Either ongoing or delivered and discuss the real buyer, you will get feedback for Quality. My Assessment is worst in Quality based on my experience
Now, You take your decision, since at last this is your property, your money and your future
Thanks
Abinash Mishra

Amrapali Group — worst maintenance

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

worst society ever!! .maintenance staff is unskilled with no degree(only diploma holders),never listens to anay complain.few examples that will show how they treat flat owners
1. a/c not working in both club and jym.
2.billiards table is broken(never repaired) reason being they dont know who did it(why no one is there at that time,where is guard.
3.swimming pool never filtered(inner and outer filters not working,steam not working,no light inside pool in-fact open wires are scrambling with their inner wire open.
4.no playground for children to play.
5. when someone enters society ,guard does not check his id ,dont call flat owners whether UNKNOWN PERSON IS ALLOWED OR NOT.
6.WORST SOCIETY TO LIVE IN .
THIS IS THE REALITY OF AMRAPALI VILLAGE

Amrapali Group — Problem in verbal commitment and Actual Progress at C-Tower & D-Tower Site

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

Dear Mr. Pradeep
As per your below mail
It seems that you really understand my problem and seriously instructed site authority to help me for my issue, but when I visited Site Office and discussed with Mr. Niyaz, it shows that you haven't even informed him about my issue. When I asked, does you have got any instruction from Pradeep Khanna/Corporate Office and shall I expect any support for my problem? His initial reply was, Who are he to instruct me. And again the same story started that when we will received material, your work will be completed. After sometime discussion, he again told me that he will try to do, but he is unable to share any concrete plan for me.
Anyway, I got to know that, what are the major work pending in my flat as of now
– UPVC Window + Glass
– Kitchen Counter
– Kitchen Modular
– Bathroom Window
– CP Fitting
– Wooden Flooring
– RO
– Wardrobe
– Kamode
– Room Gates
As per C-Tower handling Incharge ( Mr. Mrityunjay ), If I will make available first two items for C-306 Flat, he can finish other work within a week.
So, I am Expecting Mr. Pradeep you or any authorise person from corporate office can please help me in managing these items for my flat on urgent basis ?
If you can do so, it would be great help for me and hopefully it solve my current issue since in that case I could able to manage flats by 22nd May
Expecting your reply as early as possible.
Regards,
Abinash Mishra
On Thu, May 7, 2015 at 9:25 PM, Abinash Mishra wrote:
Dear Mr. Pradeep
Thanks for your reply.
As per your Instruction, I will contact Mr. Niyaz again regarding my issue tomorrow,
Though below usecase story was the outcome of discussion with Mr. Niyaz on last Saturday (02nd May'15). I also tried you to call on your number but unfortunately you haven't picked your phone.
I Will update you my discussion outcome with Mr. Niyaz tomorrow. Hope, you had instructed your site incharge also.
Thanks,
Abinash
On Thu, May 7, 2015 at 10:43 AM, Pradeep Khanna wrote:
Dear Sir,
We would like to inform you that we have already raised your issue to concern Dept.(civil Team) Further please coordinate with Niyaz-[protected].
On Wed, May 6, 2015 at 8:26 PM, Abinash Mishra wrote:
Dear All
No one from Amrapali is interested in replying customer mail?
Thanks,
Abinash
On Wed, May 6, 2015 at 6:17 AM, Abinash Mishra wrote:
Dear All
Does anyone from Amrapali Group can help me in my problem?
Thanks,
Abinash
On Mon, May 4, 2015 at 7:46 AM, Abinash Mishra wrote:
Dear All
To whom it may concern
I really don't know, who is responsible for what in Amrapali Group?
Anyway, please pass this mail to right person if you are not the right person.
Subject : On Verbal Promise done by Mr. Niyaz / Mr. Ranjit(about 15th May possession), shared my current rented house owner about his house will be vacated by us on 31st May
My Problem is already communicated my current Landlord about my house vacating plan, on the basis of promise done by Mr. Niyaz / Mr. Ranjit(about 15th May possession). Also when I recently visited the site and seen not even a single activity progress, asked site incharge about this than he told me…It was just for Saying, Your order is 24th so it will be completed accordingly. When I asked for their promise, he told me it is just for saying…
I don't know to whom, I will trust in this group. Many Issue / service level dissatisfaction given by group corporate office and not site office also did the same…
Really, don't know, How and Why any customer will buy Flat from Amrapali Group?
Hoping that any concerned people from Amrapali will understand my problem and act upon my Issue.
Thanks,
Abinash Mishra
Amrapali Zodiac
C-306
M-[protected]
On Thu, Mar 12, 2015 at 5:39 PM, Abinash Mishra wrote:
Dear Mr. Anil Sharma Ji,
Sir,
I want to put my concern in your notice. My request to you if you are seeing my mail, please go through my mail and understand the way your Amrapali group is serving your client.
My one question to you, Do you think, this is the right way to serve your customer?
Anyway my pain point is even after 3 years of delay in my possession still i am not getting my flat possession in zodiac. Also most of earlier all commitments given by your company is false, so I am completely dried out my confidence in your group.
I am really feel faked by group which is headed by my senior in academics from IIT Kharagpur. It was my mistake, I assume that if any company is managed by good academic people, probably company have some professional ethics, but it is not true here in my experience.
Not sure, but sending my last mail to you for your attention. Expecting you will take some action once it will come in your notice.
Thanks,
Abinash Mishra
Flat Info : C-306, Amrapali Zodiac, Sector 120, Noida
You can reach me @[protected]
On Wed, Mar 11, 2015 at 6:47 AM, Abinash Mishra wrote:
Hi All,
Any One in this mail recipients list, can provide me the right recipients mail id if you are not the concerned person.
If any one of you are linked with my concern please reply me with some information. I am really Pissed up with Amrapali Group Service.
Any Customer is expecting this much status from you and what are the action you are taking on delay
For your Information, My Flat Possession date was June 2012 including ( plus minus 3 month). Many time contacted also but every time you guys have given new timeline
This is enough, and after warning also, their is no response also. I really don't understand why you are so much confident that no one will do any thing to you
For your knowledge, Govt. In center has changed now, and I am sure they will look the matter more seriously on frauds done by real state company
This is last reminder to all of you, please respond by 12th March, If not than we will start seeing other possibilities for me as customer
Thanks,
Flat Info : C-306, Amrapali Zodiac, Sector 120, Noida
You can reach me @[protected]
On Mon, Mar 2, 2015 at 5:24 PM, Abinash Mishra wrote:
Hello Mr. Mohit Gupta,
Gentle reminder! (1)
Thanks,
On Sun, Mar 1, 2015 at 10:00 AM, Abinash Mishra wrote:
Hello Mr. Mohit Gupta,
I am really very much concerned with Amrapali Group service provided to customer.
After many verbal commitment still not sure about my flat possession date. I am putting last effort and mailing you and Mr. Anil Sharma Ji for my concern. Hope you will understand our pain and take some action in installing our trust with this group.
My Expectation:
1. Final confirmed date of possession
2. Penalty payment calculation and payment schedule
Flat Info : C-306, Amrapali Zodiac, Sector 120, Noida
You can reach me @[protected]
Thanks
On Wed, Feb 25, 2015 at 11:36 PM, Abinash Mishra wrote:
Hi
May I know the reason behind the delay of my flat ( C-306) in Amrapali Zodiac?
Also, Explain me why you have not provided penalty for my delay.
I will wait for your reply till 27th Feb, after that I assume that you are interested in legal way of solution.
PS: I am fed-up with your verbal commitment, so requesting you to do the action urgently, otherwise I don't have any choice other than by going through consumer complain against you.
Expecting your reply and some action on my issue immediately.
Flat Info : C-306, Amrapali Zodiac, Sector 120, Noida

Amrapali Group — I want immediate action for the issue mentioned below from Amrapali Group

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

[protected] Forwarded message[protected]
From: Abinash Mishra
Date: Mon, Apr 27, 2015 at 7:16 PM
Subject: Re: [ Reminder 2] Re: [ C-306, Amrapali Zodiac ] Concern raised to you by mail and personal meeting on 5:00 PM, 15th April'2015
To: Neeraj.[protected]@amrapali.in, a.k.[protected]@amrapali.in
Cc: Amrapali Zodiac, [protected]@noidaauthorityonline.com, [protected]@nic.in, [protected]@gmail.com, Abinash Mishra
Dear Mr. Neeraj
I am still waiting for your reply.
I don't know, why Amrapali builder's employee have so much arrogance and negligence in service. Almost waiting for reply from 10+ days.
Dear Mr. Anil Sharma Ji
I have visited your Corporate office twice to meet you, but unfortunately couldn't able to meet you since as per your PA ( Amit Kumar), you are not available.
Requesting you to share your availability, since I found lots many irregularity in service promised. Also, very unfortunate and unprofessional behaviour shown by most of your employee, which is present in corporate office.
Regards,
Abinash Mishra
On Fri, Apr 17, 2015 at 9:44 PM, Abinash Mishra wrote:
Dear Mr. Neeraj
Gentle reminder!
As per your commitment on personal meeting expecting your reply by Friday EOD or Saturday on all my concerns mentioned below. Please help me to understand the factual reason behind my below mentioned concerns. Expecting your reply latest by Saturday18th April, 2015.
Note: Since, all dues are cleared to you, so hoping that you or your CRM department positively shared my FLAT NOC to site concerned person.
Regards,
Abinash Mishra
M-[protected]
C-306, Amrapali Zodiac
On Thu, Apr 16, 2015 at 2:01 AM, Abinash Mishra wrote:
Dear Mr. Neeraj
As we discussed today and you asked me to raise your concern over mail, So let us know my concerns below. I am expecting your reply for my concern with facts documents as per your commitment in 02 working days.
1. As per the Allotment Cum Builder –Buyer agreement Clause no. 21 .a/b/c, Amrapali is supposed pay for the delayed period unless it’s a proven case of ‘Force majeure . Since we have not heard from you or any official related to Amrapali about the same in last two years and thus we don’t see it’s a case of force majeure Hence we expect you to pay us for the delayed period for the loss we have occurred financially during this period.
2. As we understand, the super area would be reduced if the construction floors are increased. If so, please let us know what kind of adjustment you have done in our super area calculation and overall flat cost. If not, requesting you to share your view on reply
3. Please let us know in case there is any further deviation in interiors plan as stated in the agreement e.g RCC slab/ wooden flooring Master BR etc.)
4. On company professional ground also, do you think position order is right in your Amrapali zodiac? You Launched tower in order where A ~ F was the first launched tower, and rest you already know. Do you think, this is right professional ethic for the company?
5. I visited the site and site is not seems ready for stay, and I am pretty sure the way progress is going on, you can’t deliver in within 2 months with full completion. Can your management confirm us that the all work in progress will be completed in 60 days?
6. In all cases, I am looking your written communication point by point
7. All your dues cleared today, though not convinced with the demand letter made to me, in expectation that you will complete my flat and handover to me as early as possible. Hope you will maintain your timeline written in intimation letter professionally, which save my some financial losses.
Other than that,
Please share me the following documents
– Detailed Payment report
– Breakup in payment like, how much I have paid as a delay patently with detailed report.
– How much you have paid me as delay patently, and if there is period for that you haven’t paid, please share me the written document with proper reason
– Please share me the all approval letter given from Noida authority to you for C-Tower ( NOC for Tower C Possession)
– Also, if my payment delayed you put me penalty, why the same is not for your delayed payment for Penalty. Please share your view.
I am expecting your reply and original document through the post also for the same.
As we discussed, you want 2 days for this, so I am expecting your reply mail and letter by Friday/Saturday.
PS:
– For Original document, you can use my correspondence address in your record
– Resending mail with attachment of docs, some spelling correction and clear expected target timeline
Regards,
Abinash Mishra
M-[protected]
C-306, Amrapali Zodiac

Amrapali Group — Why HDFC/LIC have not started funding of this project

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

Hello,

After Noida Ext row is sorted out, the builder started work and all other banks started disbursement of loan for the said project. However HDFC (I have loan from HDFC) and LIC still not disbursing loan.

Reason being, Amrapali have not paid and not paying regular installments to Noida authority.

Unless it is paid, we are not sure that the project will ever be completed. Our money is stuck. There are 50 odd home buyers suffering.

Please help
Mayank Bansal
+91 [protected]

Amrapali Group — Amrapali Castle Flat Possession

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

I got NOC from Amrapali after final payment and provided the same to Amrapali castle society for final possession. But now its over 5 months and they are not ready to give possession.. Society is saying head office not giving them supplies so that they complete the flat and whenever we visit head office they no no this time it will get completed.. but till now nothing is moving .

Amrapali Group — Stay away from this one

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

Income tax raids on Amrapali group for tax evasion

NEW DELHI: The income tax department is conducting raids on real estate firm Amrapali Group, one of the biggest builders in the National Capital Region, for suspected evasion of taxes and black money circulation. The company is closely associated with Indian cricket captain MS Dhoni who is a brand ambassador for the firm while his wife Sakshi holds 25% stake in one of the joint ventures of the group.

The I-T department swoop was launched on Wednesday with raids being conducted at various premises of the group in Delhi, Noida, Greater Noida and Faridabad. Various teams of the I-T department have seized crucial documents of the company which would be examined after the raids are over.

Sources said the I-T department was tipped off about the group having allegedly circulated black money through various means and in turn evaded taxes to the tune of crores of rupees. "The raids are still on and exact details of the recovery and of tax evasion, if any, would be clear only after scrutiny of all the documents, " a senior I-T official said.

The company, however, denied all allegations of wrongdoing. Amrapali Group's CMD Anil Sharma said, "We are absolutely clean and have done nothing wrong. These raids are a byproduct o[censored]neven taxation system."

Amrapali is one of the largest groups developing residential and commercial buildings in Delhi NCR with focus on Noida, Greater Noida, Indirapuram and other East Delhi locations. According to its website, the group has completed projects spread over more than 100 acres while 30-odd projects are under construction. It is also developing townships in Bhilai and Jaipur while has recently made a foray into the hospitality sector.

Dhoni's association with the company is through one of the joint ventures where his wife has a stake. According to the ministry of corporate affairs' website, Dhoni's wife Sakshi holds 25% stake in the joint venture Amrapali Mahi Developers Private Ltd.

Dhoni is also a key figure in their advertisements for residential properties. He also figures prominently on the home page of the real estate firm's website.

Amrapali Group — Continued stalled position in finishing of my flat. M-1103, Zodiac, for past six Months.

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

I made final payment for the flat M-1103, Amrapali Zodiac on 22’Dec’2014 & also for dual-meter, as final Demand letters of even date were received by me. I received letter assuring possession of finished flat within 2 months.
It is really appalling situation at site whereby only 20% of the finishing work is done till date and even after continuous follow up, nothing has moved as yet.
I am at a loss to understand that things are not moving after six month of final payment, to whom shall I contact for explaining my plight.
Request you to please help getting the possession of my flat

Amrapali Group — Amrapali Silicon City Noida Demand on Offer of Possession

phone
+91 12 0405 5555
website
www.amrapali.in
location
Amrapali Corporate Tower C-56/40, Sector-62, Noida, Uttar Pradesh, India – 201307

Offer of possession for my Penthouse in R tower Amrapali Silicon city, Noida sector 76 was sent in August 2014 with demand of final payment however, it is not ready as of today. There is no Plaster work done or plumbing, electric, not even brick work is completed which means house is absolutely not in a condition of possession. Even the elevator is not functional in aforementioned Tower.
Offer of possession is offered when finishing work is completed, which comprises plaster, plumbing, electrical, tiles, POP, etc. Only when these heads are completed or near completion, builder sends out possession offer where owner is asked for their preference of wall colors and other options if available.
However, not when plaster work is incomplete.
What do I do with the penthouse when the elevator is not functional?
I even spoke to the site manager, who did claim the construction is as per schedule and of ‘course the penthouse is ready for possession, if needed, I should speak to someone from corporate office, which is in Sector 62 noida, which I did and Mr. Praveen (from corporate office) confirmed over email to ignore the demand letter however, when I met him after a month, he said, he only asked me to ignore the letter for a month and I should make the payment now or else it might attract interest due to late payment. When I asked him if he had any idea on the construction status to which he said he will check??? Isn’t this crazy?
Builder has sent me a demand of +1 Cr demand and no one has any idea on the construction status, be it site manager or corporate office, all they want is that I should make the payment.
My question is how a builder can send an offer of possession when flat is actually not ready for possession.
As of moment, builder is sending out possession letters and is completing only those houses for which they are receiving payments irrespective of basic amenities are available or not e.g. elevator, generator back up, water back up, etc. or as a matter of fact even if the flat’s finishing work is not even completed.
I wonder if there is any LAW to save buyers or what if we can file PIL against this builder.
Please advise.